Hillside and Multi-Level Decks in Kirkland & the Eastside

On the Eastside, the best view is often off a kitchen door eight to fifteen feet above a falling yard. Decks on slopes and second-story decks cost 30% to 80% more than ground-level decks of the same size because the structure does more of the work: taller posts, engineered footings, lateral bracing and a stair that has to land somewhere sensible. Hans Construction builds them with an engineer's input on every one.

Get a Free Design & Quote — we bring the level and the tape to the first visit.

Get a Free Design & Quote Call +1(425) 518-1187
Multi-level cedar deck with stairs and raised planters behind a green house

Three common situations

Second-story deck off the main floor.

Daylight-basement and split-level homes in Bellevue, Kirkland and Issaquah put the main living area a full story above the backyard. The deck sits on tall posts with a lower patio or storage area underneath.

Deck on a slope.

The ground drops away under the deck, so posts on the downhill side are much taller than on the uphill side. Footings may sit on a slope that needs geotechnical review.

Multi-level or tiered deck.

Two or three platforms stepping down with the yard, connected by wide steps, often with a dining level by the house and a lounge or hot tub level below.

What the structure needs

  • Footings designed for the soil and slope; on steep or mapped landslide-hazard lots, a geotechnical report may set the footing depth.
  • Posts sized for their height, typically 6×6 minimum, with steel or larger posts for tall decks.
  • Lateral bracing: knee braces, diagonal braces or a hardware connection to the house floor framing so the deck does not sway.
  • Ledger attachment to the house rim with through-bolts and lateral-load connectors.
  • Stair design: long stairs need a landing; the city limits the rise of a single flight.

Under the deck

A second-story deck creates a covered area below. Options: a dry patio underneath using an under-deck drainage system that collects water between the joists; a storage area with screened or lattice sides; or simply open space with good airflow, which is best for the framing.

Hillside deck costs on the Eastside

DeckInstalled range
200 – 300 sq ft second-story deck, composite, aluminum rail, one stair$40,000 – $70,000
300 – 450 sq ft hillside deck, tall posts, engineered footings$55,000 – $100,000
Two-level deck, 400 – 600 sq ft total, wide steps between levels$55,000 – $110,000
Under-deck drainage system$12 – $22 per sq ft

Hillside deck questions

Do I need an engineer for a hillside deck?

Most cities require engineered drawings for decks above a certain height or on steep slopes, and we use one for every elevated deck regardless, because the bracing details matter.

Why does my second-story deck sway?

Missing lateral bracing or a weak house connection. It is the most common structural complaint about older elevated decks and is fixable.

Can I have a dry space under my deck?

Yes, with an under-deck drainage system installed between the joists before the boards, or a sealed roof below the framing.

What railing is best for a view deck?

Glass panel or cable railing keeps the view open. See Railings & Stairs.

How long does a hillside deck take?

Two to four weeks on site, plus permit time, which is longer when geotechnical review is involved.

Get a Free Design & Quote

Send a photo from the yard looking up at the door. We will tell you what the structure needs.